Background Image
Table of Contents Table of Contents
Previous Page  148 / 236 Next Page
Basic version Information
Show Menu
Previous Page 148 / 236 Next Page
Page Background

KHS Corpoplast GmbH

Meiendorfer Straße 203

22145 Hamburg

Deutschland

Tel: +49.40.67.907 0

info@khs.com

* Subject to technical modifications and price changes. On request, we will be glad to provide you with a binding offer.

Version 1 Date 31.03.2014

Description

With the new adhesive free, maintenance friendly conveying mandrel, format

changes (replacement of the mandrel head) can be realized in a quick and time

saving manner.

Furthermore, the replacement of bearings and sliding parts (deflectors) can be

performed with ease and quickly during maintenance of the mandrel. The

mandrel head can simply be loosened and remounted with an assembly tool,

because it is secured by a disk spring.

The time-consuming loosening of the glued part is eliminated, which reduces the

maintenance time (by up to 75%) and the risk of damage due to assembly

difficulties.

The mandrels with "nose" are particularly well suited to lightweight preforms and

bottles, as the mouth area is ideally fixed on the mandrel.

Benefit

Up to 75% time saving during mandrel maintenance §Reduced workload

Increase in productivity

Higher reliability of operation due to robust system and less installation

effort

Reduction in risk of damage

Longer maintenance intervals

Scope of supply

Quick assembly conveying mandrel

with adhesive free head secured by

disk spring

Adaptation of documentation

Contact

Blomax.Aftersales@KHS.com

Conversions time / Delivery time

Conversions time for 250 mandrels:

Approx. 1 hour for a trained

maintenance engineer to install the

new mandrel (depending on machine

size)

Delivery time: 4-6 weeks after order

confirmation

KHS InnoPET

QUICK ASSEMBLY CONVEYING MANDRELS

EN

KHS InnoPET

TECHNICAL UPGRADE

INCREASE IN PRODUCTIVITY

Suitability

KHS InnoPET Blomax

- Series III C machines