1 - Register Control System |
3 |
SI451001_REG |
5 |
2 - No.7 Switchroom |
6 |
SI451001_RPT_C |
7 |
3 - MCC |
19 |
SI451003_RPT_A - No3 PumpHouse MCC - Basis of Design.pdf (p.1-8) |
20 |
SI451004_RPT_A - No7 Switchroom MCC Tender.pdf (p.9-24) |
30 |
SI451005_RPT_A - No7 Switchroom MCC Tender Appraisal.pdf (p.25-42) |
51 |
4 - Installation Tenders |
70 |
SI451001_INS_A - No.3 Pumphouse Electrical Infrastructure Scope of Work.pdf (p.1-33) |
71 |
I Applicable Standards |
92 |
3 METHODS OF WORK AND MATERIALS |
95 |
3.1 Installation Standards |
95 |
3.2 Materials |
95 |
3.3 Electrical Contractor |
95 |
3.4 Position of Electrical Equipment and Appliances |
95 |
3.5 Segregation of Service |
96 |
3.6 Fixings |
96 |
3.7 Clean Up |
97 |
3.8 Earthing |
97 |
3.8.1 General Soil Conditions |
97 |
3.8.2 System Earthing |
97 |
3.9 Cabling |
98 |
3.10 Cable Supports |
100 |
3.11 Testing and Commissioning |
102 |
SI451002_INS_B - No.3 Pumphouse MCC Power Supply - Scope of Work.pdf (p.34-49) |
105 |
SI451003_INS_A - No_7 Switchroom - Board AC Changeover - Scope of Work.pdf (p.50-69) |
122 |
SI451004_INS_A - No_7 Switchroom - Board EE Changeover - Scope of Work.pdf (p.70-88) |
144 |