No.7 Switchroom Supporting Design Documentation Next Page
Information
Show Menu
No.7 Switchroom Supporting Design Documentation Next Page

 




1 - Register Control System
3

SI451001_REG
5

2 - No.7 Switchroom
6

SI451001_RPT_C
7

3 - MCC
19

SI451003_RPT_A - No3 PumpHouse MCC - Basis of Design.pdf (p.1-8)
20

SI451004_RPT_A - No7 Switchroom MCC Tender.pdf (p.9-24)
30

SI451005_RPT_A - No7 Switchroom MCC Tender Appraisal.pdf (p.25-42)
51

4 - Installation Tenders
70

SI451001_INS_A - No.3 Pumphouse Electrical Infrastructure Scope of Work.pdf (p.1-33)
71

I Applicable Standards
92

3 METHODS OF WORK AND MATERIALS
95

3.1 Installation Standards
95

3.2 Materials
95

3.3 Electrical Contractor
95

3.4 Position of Electrical Equipment and Appliances
95

3.5 Segregation of Service
96

3.6 Fixings
96

3.7 Clean Up
97

3.8 Earthing
97

3.8.1 General Soil Conditions
97

3.8.2 System Earthing
97

3.9 Cabling
98

3.10 Cable Supports
100

3.11 Testing and Commissioning
102

SI451002_INS_B - No.3 Pumphouse MCC Power Supply - Scope of Work.pdf (p.34-49)
105

SI451003_INS_A - No_7 Switchroom - Board AC Changeover - Scope of Work.pdf (p.50-69)
122

SI451004_INS_A - No_7 Switchroom - Board EE Changeover - Scope of Work.pdf (p.70-88)
144