©2016 Hubbell Incorporated |
hpsliterature@hubbbell.com|
hubbbellpowersystems.comBOX COLLARS
Hubbell has a policy of continuous product improvement. We reserve the right to change design and specifications without notice.
SF_07_048_E
QUAZITE BOX COLLAR
INSTALLATION
Quazite
®
box collars are designed to be installed quickly and easily. All box collars
have lifting inserts pre-installed in their face, but smaller box collars are light
enough for two individuals to lift and install. To install using lifting straps, please
unscrew the protective caps and insert a 1/2-13 UNC eyebolt.
TO INSTALL
•
Place the underground enclosure and leave 1-inch of the enclosure above grade
•
Leave a distance of 2-inches below grade to place the Quazite box collar
(3-inches total)
•
Compact the soil or place crushed rock 12-inches around the enclosure
•
Place the collar over the underground enclosure by hand, or with a backhoe
•
Backfill the soil around the outside of the Quazite box collar
•
Clean up the site - no protective barriers or additional site vists needed
Installation videos showing the proper install of Quazite underground enclosures
and Quazite box collars are available. Please visit:
www.HubbellTV.netand
click on ‘Enclosures’ to view installation videos.
FITS PG SERIES (SIZE)
PART #
CC1118A03T11R
CC1324A03T11R
CC1730A03T11R
CC2436A03T11R
CC3048A03T11R
WEIGHT OVERALL WIDTH
35 3/8"
37 1/2"
41 5/16"
48"
54 3/16"
OVERALL LENGTH
11" x 18" (All depths)
13" x 24" (All depths)
17" x 30" (All depths)
24" x 36" (All depths)
30" x 48" (All depths)
85 lbs.
97 lbs.
125 lbs.
228 lbs.
274 lbs.
42 1/4"
47"
54 5/16"
59 5/8"
71 5/8"