Table of Contents Table of Contents
Previous Page  260 / 499 Next Page
Information
Show Menu
Previous Page 260 / 499 Next Page
Page Background

This report is intended for use by the management of the Variable Annuity Life Insurance Company ("VALIC") and its subsidiaries.

VALIC Retirement Services Company ("VRSCO") and VALIC Financial Advisors, Inc. ("VFA"), its user entities, and the independent

auditors of its user entities, and is not intended and should not be used by anyone other than these specified parties.

Back to TOC

Click

VALIC

.com 53

Control Objective 2

- Controls provide reasonable assurance that modifications to non-monetary participant data

are properly authorized and are completely and accurately recorded.

VALIC Control Activities

Tests of Operating Effectiveness

Results of Tests

2.6 A report is generated for non-

monetary participant updates

resulting from an internal rollover

request which is reviewed and

approved by new business

management.

Inspected a sample of New Business-

SOX (NB-SOX) reports to determine

whether non-monetary participant

updates were reviewed and approved

by management. For NB-SOX reports

that contained corrections noted

on the review, inspected supporting

documentation to determine whether

the update was investigated and

resolved in a timely manner.

No exceptions noted.

2.7 Participants are authenticated

within the

VALIC.com

application

using a unique User ID and

passwords that are in accordance

with AIG Policy.

Observed a Business Analyst log in

to

VALIC.com

participant account to

determine whether a unique User ID

and password were required.

Observed password parameter

requirements when resetting a

password to determine whether they

are in accordance with AIG Policy.

No exceptions noted.

No exceptions noted.

2.8 An index file of the scanned

documents is routed to AWD

for processing. The job that

routes the image file to AWD is

monitored for processing.

Observed evidence of the Windows

service used to transfer the index file

of the scanned documents to AWD.

Observed the configuration to

monitor for errors to determine

whether notifications are sent to the

appropriate individuals in the event of

a process failure.

No exceptions noted.

No exceptions noted.

IV. VALIC control objectives and controls, and PricewaterhouseCoopers LLP's tests of operating

effectiveness and results of tests