[IMC FS 2016]
28-Oct-16, Slide 20
Case study 3 – Tank overspill during unloading
Specification stated:
–
“on detection of high
high level close the
inlet valve”
SRS process of defining
the SIF concluded that
to cover all defined
initiating causes:
–
“on detection of high
high level close the
inlet valve and the
outlet valve”
(sometimes multiple)