Slide 31
InstMC FS2016 V1.3
Nicol Instrument Engineering Limited
Verification
Clarifies that planning shall be carried out
throughout the SIS safety life-cycle.
New requirements for when the verification
includes testing. Including:
–
Strategy for integration of application program and
hardware and field devices.
–
Scope that describes the test set-up, and what type of
test are to be performed.
–
Etc.
Modifications identified during testing now
require an impact analysis.