px Limited, Bramhall Terminal – Functional Safety Committee

Minutes of Meeting February 2017

P & I Design Ltd

DOCUMENT NO: SC021008_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 30.03.17

Tel: + 44 (0)1642 617444

PAGE 14 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

considered complete. ACTION - February 2016 – Instrumented Safety Shutdown Systems

to be highlighted in the training Programme and Plan. Now complete.

4.5

Review of organisation and resources.

px are now providing EC&I support for the operation of the terminal and the compliance

and maintenance of the Safety Instrumented Systems.

P&I Design are providing Functional Safety Management support and assistance in the

compliance, testing and maintenance of the Safety Instrumented Systems.

A local maintenance team is responsible for the procedures to ensure the maintenance of the

Safety Instrumented Systems.

There is dedicated contractor support for local electrical and instrumentation issues,

including the Safety Instrumented Systems. There is no back-up for this cover and electrical

drawings may not be up to date. Knowledge base and cover to be considered. NEW

ACTION S.M. January 2015 – January 2015 - Methods of addressing this weakness have

been considered and none are seen as particularly viable. Documentation to be confirmed as

complete and up to date.

February 2016, extra support has now been identified and

documentation to be upgraded. IS Calculations need to be provided as per DSEAR loop

sheets required as part of documentation upgrade. IS calculations and loop sheets now

completed. Contractors are now being introduced to site operations and maintenance to gain

site knowledge.