Safety and environmental standards for fuel storage sites

Final report

199

L111

HSG191

HSG190

Schedule 2 requirements relevant

to on-site plan:

427-428: MAPP must demonstrate

SMS in place

429-456: Detail of requirements of

SMS.

431: Roles and responsibilities

(control of emergencies).

434–436: Identification of hazards/

emergencies.

446–449: MAPP/SMS

requirements for emergency

planning are detailed for LT sites.

189–208: Specifies general

requirements of MAPP/SMS.

199: Figure 2 shows how MAPP

and on-site plan fit with overall risk

control systems.

209–212: Specifies contents of

MAPP.

209 (d)(v): Requires arrangements

for identifying foreseeable

emergencies by systematic

analysis, and for preparing, testing

and reviewing emergency plans in

response to such emergencies.

220: Requires details of

responsibilities for controlling

emergencies.

Other documents

12 CHIS3. HSE guidance document on MAPP for LT sites. Reinforces need to identify and

control emergencies. Refers to COMAH regulation 5 and Schedule 2, and to HSG191 for help.

Regulation 5(4)

13 MAPP shall be reviewed and revised where necessary in the event of significant modifications.

L111

HSG191

HSG190

138: Reinforces when changes are

required and references guidance

under regulation 8(4) on what

constitutes significant change.

Regulation 5(5)

14 The operator shall implement the policy set out in their MAPP.

L111

HSG191

HSG190

139: Emphasises must implement

the policy in the MAPP.