Safety and environmental standards for fuel storage sites
Final report
233
Table 23
Assessment of vulnerable emergency response equipment and resources
Site:
Major incident scenario:
Results of consequence analysis (hazard ranges):
1 Identify vulnerable critical emergency
response equipment and resources
2 Assess
the potential
damage and
consequences
(consider
potential loss
of functionality,
availability and
reliability)
3 Identify
existing
contingency
arrangements
4 Are existing
arrangements
adequate?
5 Consider additional
measures and take
necessary action
Critical
emergency
response
equipment and
resources
Applicable? Vulnerable
Additional
measures
Comments/
actions
(including
amendments
to emergency
plan/exercises
to test
adequacy of
contingency
arrangements)
On-site equipment
Fire pumps/
pumphouse
Firewater
tanks/
pipework
Fixed deluge/
spray systems
Firewater
hoses
Ancillary
equipment
(adaptors,
fittings, etc)
Mobile pumps
Mobile water/
foam cannons
On site
emergency
vehicles
Specialist
equipment
(mobile
detectors etc)
Personal/
respiratory
protective
equipment
(PPE/RPE)
Spill response
equipment
Emergency
shutdown
systems
Automated
systems
Other (specify):