Safety and environmental standards for fuel storage sites

Final report

250

BSTG paragraph reference Status

PSLG report reference

44

Superseded

Recommendation 17, 18 – Bund capacity

45

Superseded

Recommendation 17, 18 – Tertiary containment

46

Superseded

Recommendation 17, 18 – Firewater

management and control measures

47

Updated

Part 5 Operating with high reliability

organisations – Introduction

48–57

Superseded

Appendix 5 Guidance for the management of

operations and human factors

58

Superseded

Recommendation 11, 12 – Emergency response

arrangements

59

Superseded

Recommendation 11, 12 – Principles

60

Superseded

Recommendation 11, 12 – On site emergency

plan

61

Superseded

Recommendation 11, 12 – Firefighting planning

and preparation

62–63

Deleted

Not required in final PSLG report

64–70

Copied

Recommendation 1 – Systematic assessment of

safety integrity levels

71–72

Updated

Recommendation 1 – Systematic assessment of

safety integrity levels

73–75

Superseded

Appendix 2 Guidance on the application of layer

of protection analysis (LOPA) to the overflow of

an atmospheric storage tank

76–77

Copied

Recommendation 1 – Incorporating the findings

of SIL assessments into COMAH safety reports

78–80

Updated

Part 2 Protecting against loss of primary

containment using high integrity systems –

Introduction

81

Superseded

Appendix 5 Guidance for the management of

operations and human factors

82–119

Copied

Recommendations 3, 4 and 5 – Tank overfill

prevention: Defining tank capacity

120–157

Updated

Appendix 5 Guidance for the management of

operations and human factors

158

Updated

Part 4 Engineering against loss of secondary

and tertiary containment – Introduction

159–160

Updated

Recommendations 17, 18 – Bund Integrity (leak

tightness)

161–173

Updated

Recommendations 17, 18 – Fire resistant bund

joints

174

Updated

Not required in final PSLG report

175–181

Updated

Recommendations 17, 18 – Fire resistant bund

joints

182

Updated

Recommendations 17, 18 – Bund capacity

183

Updated

Recommendations 17, 18 – Firewater

management and control measures

184-200

Updated

Recommendations 17 and 18 – Tertiary

containment

201

Updated

Part 5 Operating with high reliability

organisations – Introduction

202

Updated

Recommendation 19

203–217

Updated

Appendix 5 Guidance for the management of

operations and human factors

218–230

Updated

Appendix 5 Guidance for the management of

operations and human factors