Guideline – PSLG Other Products in Scope v5 – Cleared Version

Page 17 of 21

iii. Proactive monitoring of the tank level as the transfer occurs such as a

standard transfer form or software program that requires the operator to log

initial tank level from the tank gauging system, direction of level change

(increasing or decreasing) and periodic tank levels throughout the transfer.

In addition to these specific elements the duty holder should also conform to the

guidance provided in Section 5.1 Threat Lines, i.e. training, competence, demands on

operator time, audits, etc. See PSLG final report, appendix 2; annex 6 for further

guidance on cross-checks.