Local Fuel plc – Shoreham Oil Terminal
Safety Instrumented Systems – Policy and Lifecycle Activities
P & I Design Ltd
DOCUMENT NO: LF364003_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 12.06.15
Tel: 00 44 (0)1642 617444
PAGE 16 OF 19
Fax: 00 44 (0)1642 616447
www.pidesign.co.uk7.2
Design & Engineering of the SIS
Safety lifecycle
Phase
Activity
Required Competencies
Design and
engineering of
SIS
DesignEngineering
Knows and understands how to select the
most appropriate sensors and final elements
to meet the process conditions and safety
integrity requirements.
Knows and understands how to select an
appropriate logic solver to meet the safety
requirements.
Has experience of selecting sensors and final
elements for SIS applications at the required
SILs.
Has experience of specifying a logic solver
for SIS application at the required SILs.
Has experience of configuring a logic solver
for SIS application at the required SILs.
Has experience of integrating and factory
testing a logic solver to meet specified
functional requirements.
Has experience of developing
documentation for SIS including
Factory and Site Acceptance Test
procedures.
Software
Development
Understands the requirements of BE EN
61511 for Software.
Is familiar with the Safety Manual for the
programmable logic solver and how to comply
with all its requirements.
Project Management
Knows and understands principles of BS EN
61508 and BS EN 61511 and their
application to the process sector.
Knows and understands company's project
lifecycle and associated procedures.
Knows and understands the companies quality
system.
stems
Functional Safety
Knows and understands details of BE EN
61511 and its application to the process
sector.
Knows and understands company's project
lifecycle and associated procedures.
Knows and understands company's quality
system
Knows, understands and has experience of
SIS software and hardware technology ina
similar application.
Experience of participating in at least one
Safety Integrity Level Assessment.
Experience of performing SIL verification
(achieved PFD) calculations.