Table of Contents Table of Contents
Previous Page  103 / 127 Next Page
Information
Show Menu
Previous Page 103 / 127 Next Page
Page Background

4 Conclusion

4.1 INDICATOR BAL.1 TSO BALANCING THROUGH

SHORT-TERM STANDARDISED PRODUCTS

AS % OF TOTAL TSO BALANCING

1) Czech Republic provided data due to its implementation deadline for the period 1 July 2016 until the end of GY 2015/2016.

The aim of the BAL NC is to, where possible,

maximise the usage of STSP for balancing pur-

poses. Based on the data provided for GY

2015/2016, the BAL.1 indicator has been cal-

culated on a yearly basis for each balancing

zone in 13 countries (AT, BE/LU, CZ 

1)

, DE, DK,

FR, HU, NL, SI, SK, PL and UK-GB) using STSP

products on a trading and/or balancing platform

during GY 2015/2016 according to their merit

order for balancing. An exception regarding the

usage of any STSP on the trading platform in its

balancing merit order is Lithuania which per-

formed balancing actions by using only balanc-

ing services.

The results, which can be found below, are on a

yearly basis, and where balancing services have

been partially conducted also on a daily basis.

No indicator has been calculated for eight coun-

tries (BG, EL, IE, PL (L-gas, TGPS), RO, SE and

UK-NI) including Estonia. Five countries (EL, IE,

RO and UK-NI) including Estonia, conducted

balancing services only via a public tender. All of

those countries except Estonia indicated the ap-

plication of interim measures. Table 1 provides

an overview of the yearly BAL.1 indicator per

country.

OVERVIEW OF THE YEARLY BAL.1 INDICATOR

Cluster

Country/balancing zone

BAL.1 indicator (GY 2015/2016)

2015

AT

100%

BE/LU

100%

DK

100%

FR (GRTgaz North/TRS)

100%

HU

100%

NL

100%

UK-GB

100%

DE (Gaspool)

96.88%

DE (NCG)

81.58%; (as of 1 May 2016) 100%

SI

85.85%

2016

CZ 

1)

100%

2019

PL (H-gas)

99.91%

SK

33.66%

LT

0%

EL, SE, IE, UK-NI

No STSP, only interim measures/balancing services in place*

BG, PL (L-gas, TGPS), RO –

* Estonia which holds derogation is using balancing services only, but has not provided any data.

Table 13:

Overview of the yearly BAL.1 indicator per country which indicates the TSO usage of STSPs for balancing

purposes

96 |

ENTSOG BAL NC Monitoring Report 2016