4 Conclusion
4.1 INDICATOR BAL.1 TSO BALANCING THROUGH
SHORT-TERM STANDARDISED PRODUCTS
AS % OF TOTAL TSO BALANCING
1) Czech Republic provided data due to its implementation deadline for the period 1 July 2016 until the end of GY 2015/2016.
The aim of the BAL NC is to, where possible,
maximise the usage of STSP for balancing pur-
poses. Based on the data provided for GY
2015/2016, the BAL.1 indicator has been cal-
culated on a yearly basis for each balancing
zone in 13 countries (AT, BE/LU, CZ
1)
, DE, DK,
FR, HU, NL, SI, SK, PL and UK-GB) using STSP
products on a trading and/or balancing platform
during GY 2015/2016 according to their merit
order for balancing. An exception regarding the
usage of any STSP on the trading platform in its
balancing merit order is Lithuania which per-
formed balancing actions by using only balanc-
ing services.
The results, which can be found below, are on a
yearly basis, and where balancing services have
been partially conducted also on a daily basis.
No indicator has been calculated for eight coun-
tries (BG, EL, IE, PL (L-gas, TGPS), RO, SE and
UK-NI) including Estonia. Five countries (EL, IE,
RO and UK-NI) including Estonia, conducted
balancing services only via a public tender. All of
those countries except Estonia indicated the ap-
plication of interim measures. Table 1 provides
an overview of the yearly BAL.1 indicator per
country.
OVERVIEW OF THE YEARLY BAL.1 INDICATOR
Cluster
Country/balancing zone
BAL.1 indicator (GY 2015/2016)
2015
AT
100%
BE/LU
100%
DK
100%
FR (GRTgaz North/TRS)
100%
HU
100%
NL
100%
UK-GB
100%
DE (Gaspool)
96.88%
DE (NCG)
81.58%; (as of 1 May 2016) 100%
SI
85.85%
2016
CZ
1)
100%
2019
PL (H-gas)
99.91%
SK
33.66%
LT
0%
EL, SE, IE, UK-NI
No STSP, only interim measures/balancing services in place*
BG, PL (L-gas, TGPS), RO –
* Estonia which holds derogation is using balancing services only, but has not provided any data.
Table 13:
Overview of the yearly BAL.1 indicator per country which indicates the TSO usage of STSPs for balancing
purposes
96 |
ENTSOG BAL NC Monitoring Report 2016