Capabilities and Capacities – Facility 1, Main Yard
Total Area (m²)
330,000 m
2
Fabrication Area Covered (m²)
Over 30,000 m
2
Assembly and Erection Area (m²)
150,000 m
2
Cranage – Lifting Capacity and Hook
Height (Tonnes and Metres)
• Dockside and quayside cranage
• 2 x 840 tonne x 70/80 metre ‘Goliath’ Gantry Cranes
(combined lift of 1,600 tonnes)
• 2 x 60 tonne at 25 metre Tower Cranes
• 1 x 9 tonne at 40 metre Tower Crane
Load-Out Capacity (Tonnes)
• Up to 30,000 tonnes via skidding on quayside
• Multi-wheel transporters capable of handling up to
780 tonnes. Additional transporters hired as necessary
Minimum Water Depth (Metres)
Main building dock – 6.4 metres (sill = 4.9 metres)
Maximum Water Depth (Metres)
Main dry dock – 9.9 metres (sill = 8.4 metres)
Dry-Dock Capability
• 556 metres x 93 metres x 11.7 metres
(main building dock)
• 500 tonnes per metre or 200 tonnes/m
2
load capacity
• Dock can be separated by installation of intermediate
dock gate to give a part wet/part dry configuration
>