The UK Offshore Oil and Gas Fabricators Directory 2014 - page 52

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2014
page 52
Capabilities and Capacities – Facility 2, Ship Repair
Total Area (m²)
81,000 m
2
Fabrication Area Covered (m²)
1,200 m
2
Assembly and Erection Area (m²)
25,000 m
2
Cranage – Lifting Capacity and Hook
Height (Tonnes and Metres)
Workshop
• 25 tonne Gantry Crane
Dry Dock
• 1 x 80 tonne at 38 metre Tower Crane
• 1 x 40 tonne at 25 metre Tower Crane
• 1 x 40 tonne at 25 metre Tower Crane
Quayside
• 1 x 40 tonne at 30 metre Tower Crane
Load-Out Capacity (Tonnes)
• Up to 30,000 tonnes via skidding on quayside
• Multi-wheel transporters capable of handling up to
780 tonnes. Additional transporters hired as necessary
Minimum Water Depth (Metres)
8.6 metres
Maximum Water Depth (Metres)
12.1 metres
Dry-Dock Capability
• 335 metres x 50 metres x 14.75 metres (Belfast Dock)
• 333 tonnes/metre or 10.94 tonnes/m
2
load capacity
>
1...,42,43,44,45,46,47,48,49,50,51 53,54,55,56,57,58,59,60,61,62,...98