Table of Contents Table of Contents
Previous Page  33 / 158 Next Page
Information
Show Menu
Previous Page 33 / 158 Next Page
Page Background

24

Adopted FY 2015-16 Budget

Expenditures by Result Area

The chart below shows a Result Area comparison

of General Fund expenditures for FY 13-14 Actual

Expenditures, the FY 14-15 Amended Budget, the

FY 15-16 Adopted Budget and the FY 16-17

Projected Budget. The FY 15-16 Adopted Budget

is $4.2 million, or 1.6%, greater than the Amended

FY 14-15 Budget.

Approximately $760,000 in expenditure savings is

achieved through planned service reductions or

efficiency improvements, including the elimination

of 14.3 full-time equivalent (FTE) positions. These

reductions are discussed in greater detail

throughout the document. Additionally, reduced

fuel prices and projections for moderate price

changes during FY 15-16 allow for about $800,000

in budgeted fuel reductions. These savings are

concentrated in the Police and the Field

Operations Departments.

The Public Safety Result Area, which includes

Police, Fire and the General Fund support for the

Metro 911 Fund, shows an increase of about $3.4

million, or about 2.8%. The Adopted Budget

includes six additional firefighter positions to add an

additional position to two ladder companies for each

response shift. Six positions were added during the

FY 14-15 budget year for the same purpose, for a

total increase of twelve positions over two years. An

additional six firefighter positions are projected to be

added in FY 16-17, for a total of eighteen new

positions over three years. The General Fund

transfer to the Metro 911 Fund will increase from

$4.42 million to $4.72 million.

The Infrastructure Result Area, which includes

Field Operations, Transportation, Engineering and

Inspections, Planning, and contributions to Solid

Waste Management and the Coliseum Funds,

holds steady at about $69.7 million. The General

Fund transfer to the Solid Waste Management Fund

is increasing slightly from $1.78 million to $1.81

million. The General Fund transfer to the Coliseum

Fund is increasing from $2.34 million to $2.50

million for a fiscal year that will not include the ACC

Men’s Basketball Tournament.

The Community Services Result Area, which

includes the Library, Neighborhood Development and

Parks and Recreation Departments, increases

slightly from $28.2 million to $28.4 million.

Budget reductions are discussed in greater detail

within the Result Area section of the document, but

include reductions of 3.5 FTE positions in Parks

and Recreation and 1.0 FTE in Libraries.

The General Government Result Area budget

increases from $24.8 million to $25.3 million. The

budget includes $352,000 for the November 2015

municipal election.

The contribution to the Debt Service Fund will

increase from $18.0 million to $18.3 million.

The FY 16-17 Projected Budget is $8.1 million, or

3.1%, higher than the Adopted FY 15-16 Budget.

The contribution to the Debt Service Fund is

projected to increase from $18.3 million in FY 15-16 to

$21.1 million in FY 16-17 to allow for continued

borrowing for capital improvements authorized

through approved voter referenda in 2006, 2008

and 2009. Approximately $100,000,000 of

authorized bonds remain to be sold from the

previous three successful bond referenda. As

currently projected, the General Fund will require

additional revenue equivalent to one cent on the

tax rate to fund these increased debt service costs

in FY 16-17.

GENERAL FUND

2013-14

2014-15

2015-16

2016-17

Result Area

Actual

Budget

Adopted

Projected

Community Services

26,596,254

28,239,361

28,452,828

29,128,057

General Government

24,819,489

24,809,495

25,280,736

25,656,655

Infrastructure

66,166,517

69,810,046

69,744,581

71,120,881

Public Safety

115,661,632

119,513,843

122,892,616

125,689,931

Debt Service

17,515,250

18,043,080

18,272,570

21,145,616

Total

250,759,143

260,415,825

264,643,331

272,741,140

General Fund Expenditures by Result Area