Immingham East Terminal – Gasoline Overfill Protection

Safety Instrument System

P & I Design Ltd

DOCUMENT NO: SI277001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE:

F

DATE: 31.10.14

Tel: + 44 (0)1642 617444

PAGE 24 OF 29

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

7.2.3.5 Overall System Summary

System PFD = Sensor Sub-System PFD+Logic Solver PFD+Final Element Sub-System PFD

System PFD = (2.48 x 10

-4

) + (4.0 x 10

-6

) + (2.04 x 10

-3

)

System PFD = 2.3 x 10

-3

System Checks – each sub-system individually satisfies the requirements of > SIL 2 together

with the combined PFD of 2.3 x 10

-3

providing a combined > SIL 2.

7.2.3.6 PFD System Calculations – Spreadsheet Programme

P & I Design Ltd

Probability of Failure on Demand (PFD) Summary

Version 5.6

Originator:

Checked:

Approved:

Issue:

Date:

2

Valid

PFD

(SYS)

=

2.30E-03 = 2.48E-04

Valid 4.00E-06

Valid

1.02E-06 Valid

0.00E+00

n/a

0.00E+00

n/a

7.09E-04 Valid

0.00E+00

n/a

0.00E+00

n/a

1.33E-03 Valid

Valid

2.48E-04

Valid 4.00E-06

Valid 2.04E-03

Valid

S.Trip

(SYS)

=

50.5 = 192

Years

13158

Years

5051

Years

Years

n/a

Years

n/a

Years

278

Years

n/a

Years

n/a

Years

93

Years

DRR

C

24/02/2011

SAFETY INTEGRITY LEVEL REQUIRED

No.4 East Tanks

SI277001.CAL

Client Ref:

PFD

(FE)

PFD

(S)

PFD

(L)

CALCULATION SUMMARY

SAFETY INTEGRITY LEVEL ACHIEVED

S.Trip

(S)

S.Trip

(L)

S.Trip

(FE)

SPURIOUS TRIP SUMMARY

www.pidesign.co.uk

Client:

Project:

PP

DRR

Immingham East

Simon Storage

Document:

SIS Number: