Immingham East Terminal – Gasoline Overfill Protection
Safety Instrument System
P & I Design Ltd
DOCUMENT NO: SI277001_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE:
F
DATE: 31.10.14
Tel: + 44 (0)1642 617444
PAGE 24 OF 29
Fax: + 44 (0)1642 616447
www.pidesign.co.uk7.2.3.5 Overall System Summary
System PFD = Sensor Sub-System PFD+Logic Solver PFD+Final Element Sub-System PFD
System PFD = (2.48 x 10
-4
) + (4.0 x 10
-6
) + (2.04 x 10
-3
)
System PFD = 2.3 x 10
-3
System Checks – each sub-system individually satisfies the requirements of > SIL 2 together
with the combined PFD of 2.3 x 10
-3
providing a combined > SIL 2.
7.2.3.6 PFD System Calculations – Spreadsheet Programme
P & I Design Ltd
Probability of Failure on Demand (PFD) Summary
Version 5.6
Originator:
Checked:
Approved:
Issue:
Date:
2
Valid
PFD
(SYS)
=
2.30E-03 = 2.48E-04
Valid 4.00E-06
Valid
1.02E-06 Valid
0.00E+00
n/a
0.00E+00
n/a
7.09E-04 Valid
0.00E+00
n/a
0.00E+00
n/a
1.33E-03 Valid
Valid
2.48E-04
Valid 4.00E-06
Valid 2.04E-03
Valid
S.Trip
(SYS)
=
50.5 = 192
Years
13158
Years
5051
Years
Years
n/a
Years
n/a
Years
278
Years
n/a
Years
n/a
Years
93
Years
DRR
C
24/02/2011
SAFETY INTEGRITY LEVEL REQUIRED
No.4 East Tanks
SI277001.CAL
Client Ref:
PFD
(FE)
PFD
(S)
PFD
(L)
CALCULATION SUMMARY
SAFETY INTEGRITY LEVEL ACHIEVED
S.Trip
(S)
S.Trip
(L)
S.Trip
(FE)
SPURIOUS TRIP SUMMARY
www.pidesign.co.ukClient:
Project:
PP
DRR
Immingham East
Simon Storage
Document:
SIS Number: