Table of Contents Table of Contents
Previous Page  94 / 189 Next Page
Information
Show Menu
Previous Page 94 / 189 Next Page
Page Background

Immingham Storage Co Ltd – Immingham East Terminal

IME-SIS1 – Safety Instrument System Shutdown Conditions Proof Testing Procedure

P & I Design Ltd

DOCUMENT NO: SI483018_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 09.04.14

Tel: + 44 (0)1642 617444

PAGE 13 OF 17

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

7.2

Tank 564 As Found Functional Testing Continued…

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

7.2.5

Refer to SI483015_RPT

Wet test of probe required minimum

of every 5 years.

5 yearly wet test due, remove probe

from tank and immerse in suitable

liquid.

5 yearly wet test not due not use

Nivotester test button.

Record method of test

…………………………………………

System trips closing and inhibiting from

reopening FINAL ELEMENT valve and

initiating DIAGNOSTICS as detailed on

SI483012_SCH Sheet 2

Comment differences from SCH in

section 7.2.12.

FINAL ELEMENT valve action found

smooth.

Comment poor action / sticking in

section 7.2.12.

Time from test initiation to trip

activation <=2 seconds.

Comment failures in section 7.2.12

FINAL ELEMENT valve traveling time

>= 90 Seconds

Comment times < 90 Seconds in section

7.2.12

Time from test initiation to FINAL

ELEMENT valve closed <= 180 Seconds

Comment times > 180 Seconds in section

7.2.12

7.2.6

Remove probe from liquid/ release

Nivotester test button.

System remains tripped inhibiting from

reopening FINAL ELEMENT valves.

DIAGNOSTICS as detailed on

SI483012_SCH sheets 1 & 2

Comment failure in section 7.2.12

7.2.7

Operate Logic Solver Panel

SYSTEM RESET pushbutton

System healthy and reset as detailed on

SI483012_SCH Sheet 1.

FINAL ELEMENT valve automatically

reopens.

Comment differences from SCH in

section 7.2.12

Valve action found smooth.

Comment poor action / sticking in

section 7.2.12.

Opening time – No specific requirement.

Comment times > 120 seconds in section

7.2.12.

Correct FINAL ELEMENT valve

position and DIAGNOSTICS as detailed

on SI483012_SCH Sheet 1.

Comment differences from SCH in

section 7.2.12.

7.2.8

Operate HS564 Tank 564 Isolation

Pushbutton.

Correct FINAL ELEMENT valve

position and DIAGNOSTICS as detailed

on SI483012_SCH Sheet 2.

Comment differences from SCH in

section 7.2.12.

Time from test initiation to trip

activation <=2 seconds.

Comment failures in section 7.2.12

Tank 564 As Found Functional Testing Continued on page 14