Year: 2020
Street Name
Begin Location End Location Street ID Section
FC
Surf
Type
Cost Rating Treatment
PCI
Length Width Area
Last
Inspected
ST. JOSEPH DR
DIANA AVE
ROSEMARY CIR STJOSE 1010
R AC
$13 2,252,
931
SEAL CRACKS
83
8,510
37
230
8/12/2013
SUTTER BL
SERENE DR
JARVIS DR
SUTTER 1020
A AC
$54 4,251,
482
SEAL CRACKS
87
88,440
67
1,320
8/12/2013
TALBOT DR
N/O CALLE SIENA S/O LANCIA DR TALBOT 1020
R AC
$22 2,212,
454
SEAL CRACKS
83
14,060
37
380
8/12/2013
TENNANT AV
VINEYARD BLVD RAILROAD AV TENNAN 1020
A AC/A
C
$26 4,251,
482
SEAL CRACKS
87
42,768
72
594
8/12/2013
VIA DE NINOS WY
LA MAR DR
LA ARBOLEDA VIANIN 1010
R AC
$52 2,109,
631
SEAL CRACKS
82
31,080
37
840
8/12/2013
VIA NARETTO
W/O CALLE SUENO CUL DE SAC VIANOR 1010
R AC
$23 2,280,
248
SEAL CRACKS
85
17,526
32
482
8/12/2013
WINTER CREEK WY
SHADOW BROOK CARRIAGE
WICRWY 1010
R AC
$13 2,094,
227
SEAL CRACKS
86
10,710
34
315
8/12/2013
WRIGHT AV
OAKGROVE DR DEL MONTE ST WRIGHT 1030
C AC
$27 2,958,
924
SEAL CRACKS
87
43,402
45
951
8/12/2013
ZINFANDEL CR
DOMAINE DR ZINFANEL CR ZINFCR 1010
R AC
$67 1,999,
311
SEAL CRACKS
85
51,000
34
1,500
8/12/2013
$2,935
Treatment Total
$5,339,881
Year 2020 Total
Year 2020 Area Total
4,741,541
Year: 2021
Street Name
Begin Location End Location Street ID Section
FC
Surf
Type
Cost Rating Treatment
PCI
Length Width Area
Last
Inspected
CAPRICE CT
END
GRAND PRIX WY CAPRIC 1010
R AC
$8,769 14,244 CAPE SEAL
78
8,448
40
211
8/12/2013
ENGLISH WALNUT CT WALNUT GROVE
DR
END
ENGLIS 1010
R AC
$5,257 13,971 CAPE SEAL
78
5,064
24
211
8/12/2013
$14,026
Treatment Total
DIANA AV
CITY LIMIT SW/O
BRADFORD
HILL RD
DIANAA 1100
C AC
$435,553 11,846 2 IN AC OVERLAY
100
100,544
32
3,142
8/12/2013
SAN PEDRO AV
RAILROAD AV BUTTERFIELD AV SANPED 1030A
C AC
$86,640 11,846 2 IN AC OVERLAY
100
20,000
40
500
8/12/2013
$522,193
Treatment Total
ASH CT
ALMOND WY
END
ASHCRT 1010
R AC
$27,044 11,634 2 IN AC OVERLAY W/
FABRIC
100
6,336
40
158
8/12/2013
Interest: 3.00%
CITY OF MORGAN HILL
Scenarios - Sections Selected for Treatment
Inflation: 3.00%
Printed: 03/12/2016
Scenario: 2015 Recommended Budget ($5.4M,
16.5% PM)
Scenarios Criteria:
** - Treatment from Project Selection
28
SS1026
MTC StreetSaver