Simon Storage Ltd – Immingham East Terminal

Gasoline Import – Layers of Protection Analysis

P & I Design Ltd

DOCUMENT NO: SI057001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: G DATE: 29.06.12

Tel: + 44 (0)1642 617444

PAGE 30 OF 34

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

5.3.4 Mitigation Layer – All Scenarios.

1. Failure of Detection of overflow and action – Mitigation Layer

A large release may not be detected and even if detected may not be stopped. A manual

operation to shut down the transfer is possible but an operator may be required to approach

close to the vapour cloud. The area ESD may or may not shut-down the transfer. The most

realistic method of stopping the release is to stop the import of gasoline by shutting the ship

down.

Site operations consider that, in this case, the possibility of preventing a large release is low

thus no credit for this layer has been taken.

Probability of not detecting and stopping the release.

1.0