Previous Page  44-45 / 69 Next Page
Information
Show Menu
Previous Page 44-45 / 69 Next Page
Page Background

Simon Storage Ltd – Immingham East Terminal

Gasoline Import – Layers of Protection Analysis

P & I Design Ltd

DOCUMENT NO: SI057001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

Tel: + 44 (0)1642 617444

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Appendix 3

Operator Reliability

Simon Storage Operator Reliability Survey

Historical critical error data

Errors during routine operations

Seal

Sands

ISCO

West

ISCO

East

Tyne Riverside TOTAL

N

o.

ship imports in last 10 years

3840 8185 1956 1110

853

15944

N

o.

pipeline imports (from external sites) in last 10

years

10920 12025 1119 1070 3804

28938

N

o.

tank-to-tank transfers in last 10 years

3650 5365 1874 2349 1255

14493

Errors during emergency response

Seal

Sands

ISCO

West

ISCO

East

Tyne Riverside TOTAL

As a result of operator error during imports/tank

transfers:

N

o.

release events (from pipelines/hoses)

0

3

3

0

0

6

N

o.

times product sent to wrong tank

1

0

0

1

5

7

N

o.

tank overfill events (HLA went off)

2

1

1

1

0

5

N

o.

tank over-top events (product release)

0

1

0

0

0

1

N

o.

failures to respond correctly when:

1

1

HISTORICAL DATA (1998 - 2008)

Error

probability

(based on

historical

data)

HISTORICAL DATA (1998 - 2008)

Error

probability

(based on

historical

data)

8

1.35E-04

1

1

4

6.74E-05

Error

: N

o.

imports/tank transfers in which operator

failed to rig up transfer line correctly

1

2

3

Error:

N

o.

transfers in which supervisor/2

nd

operator

failed to identify operator’s error (inadequate check

or check not carried out).

Includes failures to check

all aspects of the system set-up, not just rigging of

transfer line)

0

2

0

Error:

Product was released

0

0

0

Error:

HLA was activated

0

0

1

*Note - very

small data set

makes

following

figures

unreliable

0

0

1

5.26E-02

0

0

0

0.00E+00