Background Image
Previous Page  20-21 / 62 Next Page
Basic version Information
Show Menu
Previous Page 20-21 / 62 Next Page
Page Background

wiredInUSA - November 2012

wiredInUSA - November 2012

Superior Essex Inc has opened its

first North American energy cable

manufacturing facility, in Tarboro,

NC.

The result of a two-year collabora-

tion between LS Cable & System,

Superior Essex and the city of Tar-

boro, the new plant will allow for

a significant increase in energy

cable production to meet the de-

mands of commercial, industrial

and utility customers.

The 250,000ft

2

facility includes a

125 feet high tower, for medium

voltage cable production, and

additional equipment to cover

a range of energy applications.

The building design and cable

technology were supplied by

LS Cable & System, the parent

company of Superior Essex.

The initial launch, earlier this year,

of the Superior Essex energy

cable portfolio included low

voltage

300V

and

600V

instrumentation cables and low

voltage 600V control cables.

“[The opening] marks our

expansion into medium voltage

energy cables as well as other

larger low voltage cables for

multiplemarkets andapplications.”

said Lindsay Allen, vice president

of marketing for Superior Essex.

The Grand Opening event

was hosted by Christopher Koo,

chairman of LS Cable & System;

John Son, president and CEO

of LS Cable & System; Stephen

Carter, president and CEO of

Superior Essex; and Lindsay Allen.

New

manufacturing

facility in NC

21

20

wire In -

r

INDEX