Table of Contents Table of Contents
Previous Page  26-27 / 197 Next Page
Information
Show Menu
Previous Page 26-27 / 197 Next Page
Page Background

Approval of Modifications

If ERP approves a method modification including extensions,

then the method begins a new two (2) year period.

If the method modification is to correct an editorial error then

the method, then there is no change.

Dethod modificationƐ require substantiation of the modiĨication or 

extension with proof of method performance as deemed suitable by the EPR.