Reports and Documentation
AOAC staff or designee will capture the decisions and action items into an ERP
report.
The draft report will be sent back to the ERP Chair whose responsibility it is to sign off
on the report once approved.
The report is then distributed to the ERP.
ERP is responsible for a drafting a written recommendation to the OMB for each
method at a maximum of two years following adoption as First Action OMA
Approved methods from the ERP meetings are published in the OMA and in the
Journal of AOAC INTERNATIONAL
.
Meeting overviews are published in the AOAC
Inside Laboratory Management
magazine.