Background Image
 1 / 24 Next Page
Information
Show Menu
1 / 24 Next Page
Page Background

Little Sebago Lake Association

Summer - 2015

“Our mission is to protect, restore and improve our lake’s water quality

and fragile ecosystem. We will create and nurture a community of lake

stewards, always mindful that human needs must be balanced with

the needs of the natural environment.“

BOARD MEMBERS

President

Pam Wilkinson

Co-Vice Presidents

Jeff Wilkinson

Peter Gellerson

Secretary

Diane Burnell

Treasurer

Jim McBride

Accounting Assistant

Sharon Lamontagne

Other Members

Cheryl Alterman

Rod Bernier

Steve Davis

Tim Greer

Scott Lowell

Chris Micucci

John Mullaney

Kevin Murphy

Tom Tobiassen

HONORARY

BOARD MEMBERS

Barbara Barnes

Carol Ann Doucette

Cathy Manchester

Deb Lavoie

COMMITTEE/

RESOURCE HELPERS

Merchandise

Deb Gellerson

Database Assistant

Christine Godfrey

Water Quality

Rick Sullivan

Dam Committee

Bruce Micucci

Little Sebago Lake Association

P.O. Box 912, Windham, ME 04062-0912

info@littlesebagolake.com

• 207-809-4706

Contact Us:

As you may recall, our 20 year-

old launch ramp was closed early

last Fall for a complete rebuild. The

contractor hired by the State removed

the old one and installed our new

ramp consisting of the cast-in-place

concrete header and pre-cast heavy

duty concrete planks with steel rail

guides. The ramp was dressed off

with riprap protecting the sides and

the “basin” at the end of the ramp.

The float support consisting of the

cast-in-place concrete abutment and

nine pre-cast heavy duty concrete

groundout planks was also installed

for the new docking system. A

concrete portable toilet pad was

poured and they also removed the

old guardrail system.

The site was open for ice-fishing this

past winter with ‘Caution” signage

and barricades due to the lack of a

guardrail system and the exposed

edge of the launch ramp cast-in-

place concrete header.

Before the launch can be used this

spring for boating, the remaining work

to be completed is the paving of the

ramp approach and the installation of

the new guardrail. The dock system,

Continued on Page 2

Boat Ramp Update

Mt Hunger Shores -

Leon Bucher IFW