Table of Contents Table of Contents
Previous Page  40-41 / 268 Next Page
Information
Show Menu
Previous Page 40-41 / 268 Next Page
Page Background

Tank 912 Buncefield 11

th

December 2005

The level continued to the IHLA set at 13.114m. Where a further

alarm and import shutdown should have operated.

The IHLA was disabled .

LT

IHLA