Risk Assessments
SRS
Including FSA 1
Operation &
Maintenance
Phase
Typically 10 to
30 times longer
than all other
phases
Handover to end user
Including FSA 3
Design
Including FSA 2
HRA & SIF & SIL Determination
Safety Requirement Specification
Design & Engineering
Installation,
Commissioning &Validation
Operation &
Maintenance
Modifications
Including FSA 5’s
De-commissionin
g
Proof Testing
Including Review,
Analysis and
Failure
Monitoring
De-commissioning
Including FSA 5
The SIS Lifecycle