EXISTING FRAMING
STEEL TOP PLATE SECURED
TO EXISTING FRAMING
STEEL SUPPORT COLUMN
TIE-BACK ANCHOR
NEW CONSTRUCTION PIER
DRIVEN TO LOAD BEARING
STRATA
NEW FOOTING WITH REBAR
NEW CONSTRUCTION / TIE-
BACK BRACKET
STEEL BASE PLATE SECURED
TO NEW FOOTING
DRAWN BY
SCALE
DATE
DRAWING NUMBER
This drawing is the sole property of Engineered
Solutions of Georgia. Reproducing or copying this
drawing, in whole or in part, is prohibited without the
express written permission of Engineered Solutions of
Georgia. It is only to be used for the project designated
herein and may not be used for any other project. It is
to be returned upon request.
o f G e o r g i a
Foundation Repair & Waterproofing
SUPPORT COLUMN w/
NEW CON. & TIE-BACK
OC
NTS
3/17/16
SK-1