Table of Contents Table of Contents
Previous Page  12 / 42 Next Page
Information
Show Menu
Previous Page 12 / 42 Next Page
Page Background

EXISTING FRAMING

STEEL TOP PLATE SECURED

TO EXISTING FRAMING

STEEL SUPPORT COLUMN

TIE-BACK ANCHOR

NEW CONSTRUCTION PIER

DRIVEN TO LOAD BEARING

STRATA

NEW FOOTING WITH REBAR

NEW CONSTRUCTION / TIE-

BACK BRACKET

STEEL BASE PLATE SECURED

TO NEW FOOTING

DRAWN BY

SCALE

DATE

DRAWING NUMBER

This drawing is the sole property of Engineered

Solutions of Georgia. Reproducing or copying this

drawing, in whole or in part, is prohibited without the

express written permission of Engineered Solutions of

Georgia. It is only to be used for the project designated

herein and may not be used for any other project. It is

to be returned upon request.

o f G e o r g i a

Foundation Repair & Waterproofing

SUPPORT COLUMN w/

NEW CON. & TIE-BACK

OC

NTS

3/17/16

SK-1