FY 15 Budget Review - page 12

1 Pump Station Electrical Assessment, Inspection & Service
$100,000
2 ARC Flash Assessment, Labeling & Training
$125,000
3 ARV Replacement Program
$240,000
Total Request $465,000
Contract services to inspect, assess and service medium power electrical gear, cables and cabinets at seven 
critical pump and lift stations on an annual basis. IT is critical that we have knowledge of potential electrical 
issues with our major pump/lift station, that we correct any deficiencies and/or abnormalities and that we 
perform routine electrical predicative and preventive maintenance measures to ensure station(s) reliability.           
An electrical coordination study and an ARC flash study, labeling and staff training project would ensure 
compliance with existing and future electrical safety requirements.
Air Release Valve (ARV) inspection and maintenance program for the City's approximately 500‐600 ARVs along 
pump station force mains. The City has not invested the resources into an inspection, assessment, repair, 
replacement and preventive maintenance program since before 2008. Their exact location are largely unknown 
and they do not exist on a database map. If unserviced, they cause pumping and force main issues and extended 
pump runtimes.
5230 Waste Water Treatment Plant
1,2,3,4,5,6,8-9,10,11 13,14,15,16,17,18,19