Table of Contents Table of Contents
Previous Page  28 / 60 Next Page
Information
Show Menu
Previous Page 28 / 60 Next Page
Page Background

28

GRID-Arendal has assisted Ecuador and Costa Rica

with the process of completing their submissions for

extended continental shelf. GRID-Arendal has provided

Ecuador with a comprehensive data project sourced

from the One Stop Data Shop and also assisted Ecuador

with an application to the United Nations trust-fund to

cover the cost of specialist maritime boundary software

and training. GRID-Arendal is currently assisting Costa

Rica to develop the geological argument to support the

repositioning of its outer ECS limits. This has involved

a detailed examination of existing data. A new trust fund

application has also been prepared in order to co-fund

our work with Costa Rica through 2015.

5C

Shelf Programme – Areas Beyond National

Jurisdiction

The GEF-funded ‘Areas Beyond National Jurisdiction’

project was approved in June 2014. The project contracting

is currently being finalised by UNEP/World Conservation

Monitoring Centre (WCMC), with project activities set to

commence in the first half of 2015.

5D

Sustainable Seas – Management of Human

Impacts on the Marine Environment

GRID-Arendal has been actively involved in building

capacity in ecosystem-based marine management in

developing countries. Having worked with UNEP and

the International Oceanographic Commission (IOC) of

UNESCO to develop a ‘Capacity Building for State of

the Marine Environment Reporting’ programme, a draft

workplan has now been prepared by GRID-Arendal, and

consultations are ongoing with UNEP and IOC. GRID-

Arendal also helped UNEP design a global support

programme for the Regional Seas Programme that is

now being tested in West Africa.

The State of the Marine Environment (SoME) web-based

reporting portal commissioned by the Secretariat of

the Abidjan Convention was delivered and presented at

the 11th Conference of the State Parties to the Abidjan

Convention in March. The basic approach was also

adopted by the states parties in decision CP11/13,

27

for

implementation throughout the entire region.

During a workshop held in February, GRID-Arendal

assisted the Environmental Protection Agency (EPA)

27.

http://cop11.abidjanconvention.org/media/documents/Report/COP11

%20%20%20Final%20Report%20En.pdf