Table of Contents Table of Contents
Previous Page  23 / 194 Next Page
Information
Show Menu
Previous Page 23 / 194 Next Page
Page Background

AOAC Standards Development

AOAC develops voluntary consensus standards 

using the following principles:

Transparency

Openness

Balance

Due Process

Consensus

Appeals 

Stakeholder Panel Activity

March 22, 

2016

• Define specific analytical issues

• WG chairs for

Brucella

,

Burkholderia

,

Variola

, and

Botulinum

Neurotoxin A provided 

background & proposed fit for purpose statements 

March 23, 

2016

• Form working groups to begin draft standard method performance requirements

• Working groups met on second day of SPADA meeting in March to begin their work 

and continued via teleconference

July 13‐August 

12, 2016

• Comment on draft standard method performance requirements

• Comment period for all four SMPRs began on July 13, 2016 through Friday, August 

12, 2016. 

• Deliberate and reach consensus on a final versions of the standard method

August 30, 

2016

performance requirements

• WG chairs will present draft SMPRs for stakeholder deliberation and consensus.

AOAC Standard Method Performance Requirements (SMPRs)

– Published in

Official Methods of Analysis of AOAC INTERNATIONAL

– Manuscript published in 

Journal of AOAC INTERNATIONAL