Table of Contents Table of Contents
Previous Page  31 / 122 Next Page
Information
Show Menu
Previous Page 31 / 122 Next Page
Page Background

Southern Corridor GRIP 2017–2026 |

31

TAG II

TAG I

SOL

Krk

Nagykanizsa

Tornyoszentmiklos

Pince

Porto

Viro

Umag

Koper

Rijeka

Karlovac

Lučko

Lička

Vel. Kladusa

Omisalj

Klagenfurt

Graz

H U

S L O V E N I A

ZAGREB

LJUBLJANA

Porto Levante

Cavarzere

Arnoldstein

Tarvisio

Bordolano

Gorizia

Trieste

Sempeter

Ajdovščina

Murfeld

Rogatec

Zabok

Cersak

v

Kidričevo

v

Weitendorf

Zaule LNG

P

P

P

P

P

TRA-N-361

TRA-N-094

TRA-N-389

TRA-N-112

TRA-N-354

TRA-N-101

TRA-N-104

TRA-N-107

TRA-N-092

TRA-N-262

TRA-N-261

TRA-N-108

TRA-N-099

TRA-N-093

TRA-N-390

2.2.9 SLOVENIA

TSO PROJECTS

No. Project

TYNDP Code

Status

Commissioning

(TYNDP 2017)

TSO/Sponsor

1

Upgrade of Rogatec interconnection

(M1A/1 Interconnection Rogatec)

TRA-N-390

Advanced Non-FID

PCI 6.26.6

2020

• 2 M6 Ajdovščina – Lucija

TRA-N-365

Non-FID

2019

3 CS Kidričevo, 2

nd

phase of upgrade TRA-N-094

Non-FID

PCI 6.26.2

2020

4

M3 pipeline reconstruction from CS

Ajdovščina to Šempeter/Gorizia

TRA-N-108

Non-FID

2020

5 R15/1 Pince – Lendava – Kidričevo TRA-N-112

Non-FID

PCI 6.23

2020

6

Upgrade of Murfeld/Ceršak

interconnection

(M1/3 Interconnection Ceršak)

TRA-N-389

Non-FID

PCI 6.26.5

2020

7 CS Ajdovščina, 1

st

phase of upgrade TRA-N-092

Non-FID

2021

8 CS Ajdovščina, 2

nd

phase of upgrade TRA-N-093

Non-FID

2022

9 M3/1a Šempeter – Ajdovščina

TRA-N-099

Non-FID

2022

10 M3/1c Kalce – Vodice

TRA-N-261

Non-FID

2022

11 M3/1b Ajdovščina – Kalce

TRA-N-262

Non-FID

2022

12 M8 Kalce – Jelšane

TRA-N-101

Non-FID

2022

13 M6 Interconnection Osp

TRA-N-107

Non-FID

2022

14 R61 Dragonja – Izola

TRA-N-114

Non-FID

2024

• Project not marked on the map