Immingham Storage Co Ltd – Immingham East Terminal
IME-SIS1 - Safety Instrument System Safety Requirement Specification
P & I Design Ltd
DOCUMENT NO: SI277010_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: G DATE: 31.10.14
Tel: + 44 (0)1642 617444
PAGE 12 OF 13
Fax: + 44 (0)1642 616447
www.pidesign.co.uk5.0
SIF Requirements
5.1
Tank 561 High High Level
ID:
TK561 -SIF1
Service: LE56101
Independent High High
Level in Tank 561 shuts
down: XV56101 Tank-side
Import/Export valve
Reference:
Tank 561
Required SIL:
2
Proof Test Interval:
1 year
Response Time:
Sensor and Logic Solver < 2seconds
Final Element – Trip initiation to
valve closed < 180 Seconds,
Valve traveling Time > 90 Seconds
Activation Method:
De-energise to trip (See G.R.)
Manual reset:
Manual Reset on the SIS panel (See
G.R.)
Nuisance Trip
Requirements:
ISCo to approve
Safe State:
Import to tank 561 stopped,
XV56101 Tank-side
Import/Export valve closed
Diagnostics:
Required, at Nivotester within the
SIS monitoring panel
Manual Shutdown:
At the valve, remotely outside bund
and via 4 East Crash Stop
Regulatory Reqs:
BS-EN61511
Process Setpoint:
>5 minutes before Overflow at Max
fill rate