9

The FY 16-17 Net Adopted Budget (all funds) is

about $22.0 million, or 4.4% higher than the revised

FY 15-16 budget. The Hotel Motel Occupancy Tax

Fund includes a $7.2 million transfer increase

related to the construction of the Greensboro Swarm

Fieldhouse and other improvements at the

Coliseum. Absent this transfer, the Adopted Budget

would be $14.8 million, or 3.0% higher than the

revised FY 15-16 budget.

The Infrastructure Result Area, the largest service

area at $267.4 million, shows an increase of $6.0

million over the current year. The Water Resources

Fund budget increases from $122.0 million to

$122.6 million. A reduction in budgeted debt service

costs from $27.6 million to $24.3 million allows for

an increase in the contribution to the capital reserve

from $26.6 million to $29.3 million. A proposed

increase in the Motor Vehicle License Fee will

provide an additional almost $3.9 million for

resurfacing and is included in this result area.

The Public Safety Result Area increases from

$132.6 million to $136.2 million. Six (6) additional

firefighter positions are added in the Adopted

Budget. These positions, coupled with twelve (12)

firefighter positions that were authorized by City

Council over the past two years, complete the effort

to outfit all ladder company shifts with four (4)

positions. Approximately $600,000 is included for

replacement of Police Body Worn Camera

technology.

The Community Services Result Area increases

from $40.5 million to $47.5 million. As referenced

earlier, the Hotel Motel Occupancy Fund includes

financing of the new Fieldhouse and other projects

at the Coliseum. These expenses account for the

significant increase in this result area. The Debt

Service Result Area increases from $20.0 million to

$24.0 million. Specifically, the Debt Service Fund

increases from $19.4 million to $23.4 million due to

increased borrowing costs related to successful

referenda in 2006, 2008 and 2009.

The Projected FY 17-18 Budget is 1.2% lower than

the FY 16-17 Adopted Budget.

Budgeted personnel costs are 4.0% higher than the

current year budget, including a net increase of

about sixteen (16) full-time equivalent (FTE)

positions within the total operating budget. Six (6)

additional firefighter positions are added in the

Budget. These positions coupled with twelve (12)

firefighter positions that were authorized by City

Council over the past two years completes the effort

to outfit all ladder company shifts with four (4)

positions.

Maintenance and Operations (M/O) costs, which

include transfers from operating funds to capital

projects or capital reserve funds, show about a

$13.4 million or 6.3%, increase compared to the FY

15-16 Budget. The single largest increase in a

particular fund occurs in the Hotel Motel Occupancy

Fund where a $7.2 million increase (from $4.4

million in the current year to $11.6 million) in the

transfer to Coliseum improvements supports the

construction of the Greensboro Swarm Fieldhouse

and other Coliseum improvements. Absent this

increase, M/O expenses would be increasing $6.2

million or 2.9%. Water Resources Fund will

increase its contribution to the Water Resources

Capital Reserve Fund from $26.6 million to $29.3

million. These contributions fund a variety of water

system infrastructure maintenance and repair and

help contain the overall amount of debt financing

necessary for the system. Overall M/O budgets

continue to benefit from lower fuel prices. Total

budgets for gasoline and diesel fuel will be reduced

from $7.4 million in the current year to $5.8 million in

FY 16-17.

Overall budgeted debt service expenses are

increasing from $54.3 million to $55.3 million.

Payments from the Debt Service Fund to retire

general obligation debt increase from $19.4 million

in the current year to $23.4 million for FY 16-17.

Budgeted debt service expenses decrease in the

Water Resources Fund, from $27.6 million to $24.3

million.

Capital outlay expenditures are budgeted at $15.0

million, about $1.1 million below current year. The

Equipment Services Fund is projecting rolling stock

replacement needs of $10.0 million in FY 16-17 as

compared to $10.6 million in the current year.

TOTAL BUDGET— EXPENDITURES

2014-15

2015-16

2016-17

2017-18

Category

Actual

Budget

Adopted

Projected

Personnel Costs

206,189,929

215,818,116

224,536,879

231,174,864

Maintenance & Operations

185,570,082

211,474,230

224,893,788

210,457,566

Debt Service

42,762,367

54,286,373

55,269,966

56,750,072

Capital Outlay

14,363,610

16,077,289

14,970,484

15,101,929

Total Expenditures

448,885,988

497,656,008

519,671,117

513,484,431

Total Net Expenditures by Expenditure Category