Table of Contents Table of Contents
Previous Page  647 / 1138 Next Page
Information
Show Menu
Previous Page 647 / 1138 Next Page
Page Background

ESTRO SBRT course Sept 2015

12

What happened?

“Save all” is started. All new and modified data should be saved to the DB.

• In this process, data is sent to a holding area on the server (cache), and not

saved permanently until ALL data elements have been received.

In this case, data to be saved included

• actual fluence data

• a DRR

• the MLC control points