ESTRO SBRT course Sept 2015

22

Recently… New identical Linac…

Why did QART fail?

The institution stated to use another HD MLC model. Looking back at all

the data, a systematic deviation could be detected. ( this is a strong

argument for statistical proces analysis, SPC!)

An RPC audit had been conducted. However, the MU’s needed were based

on the measurements, not on the TPS calculation. (not mandatory for RPC

check).

Lessons:

- Even in an institution with a lot of RTQA incidents can happen.

- It is not sufficient to look at all steps separately, take an integral look at

things.

- Very detailed knowledge is required to implement the right RTQA

procedures AND people should stricktly adhere to it.