Section 1

GENERAL STANDARDS

15 C 1234

Example:

15C1234

Discipline Identifier

C

Engineering

D

Architecture

L

Environmental

S

Survey

Note: When a project is created without a signed contract the

accounting dept. adds a “P “ as a prefix to the project number

(P15C1234). This is for accounting/timesheet purposes only.

Project directory folders and filenames DO NOT include the “P”

Year

Discipline Identifier

Job Number

A template Project Directory folder is

located at:

F:\+ Job Folder

It is required that you copy this folder to

the correct network drive location, then

rename folder to the assigned project

number.

(Example G:\Jobs15\15C\15C1234)

DO NOT create any folders that are not on the

list until it has been approved by all departments.

Please leave the structure intact for commonality

between projects.

Please do not remove the folders that you believe

will not be used.

During Project Closeout, empty subfolders may be

removed.

Note: When working for CTDOT - See Sect. 8 for an

additional project subfolder, not shown here, that will

need to be created using CTDOT

standards.

OVERALL JOB FOLDER LAYOUT

+

PROJECT NUMBER

+

PROJECT DIRECTORY STRUCTURE

> > >