June 2017

1-3

City of Morgan Hill

Water System Master Plan

depending on their magnitude, adjustments to the master plan recommendations might be

necessary.

This master plan included the following tasks:

Summarizing the City’s existing domestic water system facilities

Documenting growth planning assumptions and known future developments

Updating the domestic water system performance criteria

Projecting future domestic water demands

Updating and calibrating a new hydraulic model using Geographic Information Systems

(GIS) data

Evaluating the domestic water facilities to meet existing and projected demand

requirements and fire flows

Evaluating the existing groundwater conditions

Performing a capacity analysis for major distribution mains

Performing a fire flow analysis

Recommending a capital improvement program (CIP) with an opinion of probable costs

Performing a capacity allocation analysis for cost sharing purposes

Developing a 2017 Water System Master Plan report

1.3 INTEGRATED APPROACH TO MASTER PLANNING

The City implemented an integrated master planning approach and contracted the services of

Akel Engineering Group to prepare the following documents:

Water System Master Plan

Sanitary Sewer System Master Plan

Storm Drainage System Master Plan

While each of these reports is published as a standalone document, they have been coordinated

for consistency with the City’s General Plan. Additionally, each document has been cross

referenced to reflect relevant analysis results with the other documents.

1.4 PREVIOUS MASTER PLANS

The City’s most recent WSMP was completed in 2002. This master plan included an evaluation of

servicing growth to the planning area boundary, evaluated existing demands and projected future

demands, evaluated groundwater conditions and management, and recommended phased

improvements to the water system for a horizon year of 2020.