Benefits
Main Driver
Market Demand
Main Driver Explanation
PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply
Specific Criteria Fulfilled Comments
The project fulfills also the criteria of reverse flows, diversification of routes, N-1 regional, back-up for renewables, power-to-gas, market
integration (increase of competition), flexibility of the system and reduction of GHG emissions.
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Section 1
1,400
62
0
Section 2
1,200
19
0
Section 3
0
0
85
Total
81
85
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2018
2018
NDP and PCI Information
Part of NDP
Yes (Snam Rete Gas TYNDP 2016-2025)
NDP Number
TRA-F-214(into text)
Currently PCI
Yes (5.11)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 364 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
189