ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report - page 26

26 |
Southern Corridor GRIP 2014–2023
NO. PROJECT
CODE
SPONSOR
COMMENTS
COMMIS-
SIONING
NON-TSO (THIRD PARTY) PROJECTS
INVOLVING MORE OR NON-EU COUNTRIES
1 Nabucco Gas Pipeline Project
("Nabucco Classic")
TRA-N-077
These projects were not consid-
ered in the network simulations
of the present edition of the
GRIP.
The sponsor of these projects,
Nabucco Gas Pipeline Interna-
tional GmbH, entered a liqui-
dation procedure in November
2013
– – –
2 Nabucco Gas Pipeline Project
("Nabucco West")
TRA-N-078
PCI 7.1.5.
3 Interconnector
Turkey – Greece – Italy
TRA-N-010
PCI 7.1.4.
2019 Q2
4 Trans Adriatic Pipeline
TRA-N-051
PCI 7.1.3.
Considered as FID in the
present edition of the GRIP
2019
5 Trans-Mediterranean
Gas Pipeline
TRA-N-054
PCI 7.3.1.
Same project as TRA-N-189,
sponsored by DEPA
2018 Q2
6 South Stream Project
TRA-N-187
Gazprom, Eni, EdF and 6 J/V
between Gazprom and local
TSOs or State companies.
This project also includes
projects TRA-N-308,
TRA-N-309 and TRA-N-310
2015 Q4
7 East Med Pipeline
TRA-N-189
PCI 7.3.1.
Same project as TRA-N-054,
sponsored by Cyprus Govt.
2019 Q1
8 Interconnector
Greece Bulgaria – IGB
TRA-N-149
PCI 6.8.1.
2016 Q3
9 Interconnection
Bulgaria – Serbia
TRA-N-137
PCI 6.10.
Bulgarian Ministry of
Economy and Energy (MEE)
2015
10 Gaspipeline Zenica – Brod
TRA-N-224
Project linked to Plinacro's
TRA-N-066
2019
11 TANAP – Trans Anatolian Natural
Gas Pipeline Project
TRA-N-221
PCI 7.1.1.
2018 Q1
12 White Stream
TRA-N-053
PCI 7.2.3.
W-Stream
The project has not shown any
activity in the last few years
and was not considered in the
network simulations of the pre-
sent edition of the GRIP
– – –
2.3 Non-TSO (Third Party)
Projects involving more or
Non-EU countries