\
3. Select
WATER
from the
Entity Group
drop-down list, and select water pressurized main. Select
Repair Main.
4. Click
Create.
5. Enter the work order information including tasks, labor, material, and equipment.
6. Click
Save.
7. Make water pressurized mains viewable and selectable on the map.
8. Select a water main to attach the work order to.
9. Scroll down to the
Assets
panel on the work order.
10. Click the
Add asset(s) currently selected on the map
I
0
I
icon .
11.
Click
Save.
12. Create 2 more unattached work orders and then attach them to an asset.
Associate tasks and assets
1.
Create a new attached work order or open an existing one.
2. Select an asset from the map and associate a task to that asset.
Associate costs to an asset
1.
Create a new attached work order or open an existing one.
2. Associate either a
Labor
cost,
Material
cost, or
Equipment
cost to an asset.
Associate costs to a task
1.
Create a new attached work order or open an existing one.
2. Associate either a
Labor
cost,
Material
cost, or
Equipment
cost to a task.
Associate costs to a task and an asset
1.
Create a new attached work order or open an existing one.
2. Associate a task to an asset.
3. Then associate either a
Labor
cost,
Material
cost, or
Equ ipment
cost to that task.
Create a child work order
1.
Create a new work order of your choice attached to a pressurized water main.
2. In the
Work Orders
portion of the
Related Worl< Activities
panel, select the desired work order
template from the drop-down list.
Server AMS 2013 SPl End User Training Manual
Section 5: The Work Order
0
113