Hybrid applications of IEC61511 – Laurie Blackmore

Assessment methods:

(2) Use 61511 OOM approach (not really cost/benefit for reasons above)

-

Need to define tolerable $ risk per year as starting point for graph calibration or

LOPA TMEL

-

Implementing an asset SIF costs money (CAPEX and OPEX) so tolerable risk must

be > that cost, say x 10 to result in an IL1 function

-

BUT implementation cost is variable (as above) so maybe take a generic figure?

Most asset assessments result in more protection than is justified

20

Asset Assessment Issues