Hybrid applications of IEC61511 – Laurie Blackmore
Assessment methods:
(2) Use 61511 OOM approach (not really cost/benefit for reasons above)
-
Need to define tolerable $ risk per year as starting point for graph calibration or
LOPA TMEL
-
Implementing an asset SIF costs money (CAPEX and OPEX) so tolerable risk must
be > that cost, say x 10 to result in an IL1 function
-
BUT implementation cost is variable (as above) so maybe take a generic figure?
Most asset assessments result in more protection than is justified