Potential problems?

§

A less robust FSMS could lead to the potential for:-

§

Project schedule slippages, due to time spent in clarifying TQs & PQs, i.e.

design by TQ

§

Potential for expensive re-engineering of the solution based on

misinterpretation of requirements

§

The potential that a new or modified safety system that does not meet the

necessary risk reduction could be installed at site

§

Lack of demonstrable traceability to Industry good practice standards

§

Potential exposure to liabilities both corporately and professionally

§

Failure to recognise the asset management ‘inherent benefits’ of the

technology solution offered i.e. use of asset management diagnostics

features