Table of Contents Table of Contents
Previous Page  37 / 144 Next Page
Information
Show Menu
Previous Page 37 / 144 Next Page
Page Background

PERFORMANCE MEASURES

ENGINEERING

Division

Performance Measures

(SustainabilityTheme)

Actual

Budget

2016 2016 2017 2018 2019 2020 2021

LAND

DEVELOPMENT

% of Engineering Requirements and Review

documents processed within six weeks of

referral by Area Planning based on complete

and quality submission from applicants’

consultants

(Economic Prosperity and

Livelihoods)

36% 50% 50% 55% 60% 70% 75%

REALTY SERVICES

Expenses as a % of lease/rental revenues

(Infrastructure)

42% 47% 46% 45% 45% 45% 45%

OPERATIONS

% reduction in illegal dumping cleanup costs

(Built Environments)

42% 40% 50% 50% 50% 50% 50%

Reduce Preventable Employee Injuries

by 90% over 5 years

(Health & Wellness)

0% 60% 70% 80% 90% 90% 90%

Solid waste diversion rate from disposal

(Ecosystems)

72% 72% 74% 76% 78% 80% 80%

DRAINAGE UTILITY

Length of Drainage Mains Renewed or

Replaced

(Infrastructure)

4,330 2,000 2,000 2,000 2,000 2,000 2,000

Number of Soil Site Inspections

(Infrastructure)

194

200

220

240

260

300

300

PARKING AUTHORITY

UTILITY

Pay Station reliability—% of time machines

operating properly

(Infrastructure)

92% 92% 93% 94% 95% 96% 96%

Total # of managed parking spaces—time/user

restricted and pay parking

(Infrastructure)

2,104

2,150 2,250 2,450 2,600 2,700 2,800

ROADS &

TRAFFIC UTILITY

Total # of marked pedestrian crossings

(Public Safety)

1,020

1,010

1,040 1,070 1,100 1,130 1,150

Streetlight energy savings - LED replacement

program

(KWh)

(Built Environments)

NA

NA 1,168,328 2,336,656 3,504,985 4,673,313 5,841,641

Safer Schools Education and Improvement

Program

(total #)

(Education & Cultural)

29

30

33

36

39

42

45

Total # of kilometers of cycling routes

(on-street and off-street)

(Built Environments)

565

560

575

590

605

620

635

SEWER UTILITY

% of sewer mains video inspected

(Built

Environments/Infrastructure)

51% 51% 56.2% 55% 63% 66% 69%

% of sewer manholes inspected

(Built

Environments/Infrastructure)

12.2% 12.2% 16.2% 19.7% 23.3% 26.6% 29.9%

SOLID WASTE

Kitchen Waste Program total # of residences

to date

(Ecosystems)

102,700 103,300 104,500 106,000 107,500 109,000 110,500

Solid waste diversion rate from disposal

(Ecosystems)

72% 72% 74% 76% 78% 80% 80%

SURREY CITY

ENERGY UTILITY

Connected Floor Area

(m 2 )

(Build

Environments)

69,754 110,000 178,000 245,000 314,000 411,000 525,000

Ratio of hours in service to total hours since

operating commenced

(Build Environments)

100% 100% 100% 100% 100% 100% 100%

WATER UTILITY

% of single family homes on water meters

(Built Environments)

72% 70% 72% 74% 75% 76% 77%

Average winter residential water consumption

(litres per capita per day)

(Built Environments)

257

265

263

261

259

257

255

27