TAR NC Implementation Document – Second Edition September 2017 |
123
Tariff Period Consultation
CONTENT OF THE DOCUMENT FOR
CONSULTATION ON MULTIPLIERS,
SEASONAL FACTORS AND DISCOUNTS
Responsibility: consultation by NRA; decision by NRA
This section describes the content of the consultation document, while the following
section details the consultation procedure.
The consultation document must include the information outlined in Table 14.
CONTENT OF THE CONSULTATION DOCUMENT PER ARTICLE 28(1)
Article 28(1), content of consultation
Remarks
(a) Multiplier level per Article 14
Obligatory
Needs to be consulted even if the multiplier level
does not change from the previous NRA decision
(b) Seasonal factors per Article 15
Optional
Depending on whether seasonal factors are
applied or not
Both the level of seasonal factors and the
calculations for seasonal factor methodology
must be consulted upon
(c) Discounts for entry points from LNG
and entry-points-from / exit-points-to
‘isolation’ infrastructure per Article 9(2)
Optional
Depending on whether such discounts are
proposed for the points concerned
Overlap with consultation per Article 26(1)
(c) Discounts for interruptible products
Obligatory
Ex-ante and ex-post discounts level must be
consulted upon
Table 14:
Content of the consultation document per Article 28(1)
The scope of the consultation is limited to IPs by default, including their multipliers,
seasonal factors and interruptible discounts, and for discounts for entry-points-from
LNG facilities and entry-points-from/exit-points-to infrastructure ending the isolation
of MSs. If a decision is taken to extend the scope of Chapter III ‘Reserve prices’ to
non-IPs, then the consultation must also cover such non-IPs.
ARTICLE 28(1)