TAR NC Implementation Document – Second Edition September 2017

Reference to the Transparency Guidelines

Point 3.2(1)(a) of the Transparency Guidelines exempts certain points from some of

the TAR NC transparency requirements: those exit points connected to a single final

customer, and entry points linked directly to a production facility of a single producer

located within the EU. Grounds of confidentiality and commercial sensitivity exempt

two information items at those points: forecasted contracted capacity and forecasted

flows. Publication of the two information items can still occur in aggregated format,

at least per balancing zone as specified in point 3.2(2) of the Transparency

Guidelines, which matches the level of granularity for publishing other information

at such points under the Transparency Guidelines.

How to Publish

ARTICLE 31 FORM OF PUBLICATION

Responsibility: publication by TSO/NRA, as NRA decides

The TAR NC sets out the requirements for publishing information on TSO/NRA

websites and on ENTSOG’s TP. Table 18 outlines similarities and differences for the

publication of tariff information on these websites, in particular in the columns ‘how’,

‘for which points’ and ‘language’.

FORM OF PUBLICATION OF INFORMATION ON TSO/NRA WEBSITE AND ENTSOG’S TP

Where

Similarities

Differences

When

How

What

For which points

Language

Additional

On the website

of TSO/NRA

\\

At least 30

days before

auctions

\\

At least 30

days before the

tariff period

\\

In a user-

friendly

manner

\\

Clear, easily

accessible

way

\\

On a non-

discriminatory

basis

\\

Downloadable

format

All tariff

information

All points on the

system

In official

language(s) of

MS + in English,

to the extent

possible

Plus a link on

ENTSOG’s TP

Directly on

ENTSOG’s TP

Some tariff

information:

\\

Reserve

prices

\\

Flow-based

charge

\\

Simulation of

all costs for

flowing

1 GWh/day/

year

IPs by default

1)

In English only In a standardised

table

Table 18:

Form of publication of information on TSO/NRA website and ENTSOG’s TP

 1) The standardised table may capture also non-IPs.