TAR NC Implementation Document – Second Edition September 2017 |

15

For the TAR NC, ENTSOG has organised three public con-

sultations, five stakeholder joint working sessions and three

workshops to engage with stakeholders and solicit their

views. With each version of the draft TAR NC, ENTSOG

published three additional documents explaining the

choices made in the draft legal text 

 1)

.

\\

ACER provides a reasoned opinion on the draft NC sub-

mitted by ENTSOG within a time period of no more than

three months.

The TAR NC reasoned opinion preparation took three

months

 2)

.

\\

ENTSOG may choose to amend the draft NC

‘in the light

of’

ACER’s reasoned opinion and re-submit it to ACER.

The Gas Regulation is silent on the duration of the poten-

tial interaction between ENTSOG and ACER.

As with all previous NCs, ENTSOG has re-submitted the

redrafted TAR NC to ACER

 3)

along with a document ex-

plaining the choices made in the legal text 

 4)

. ENTSOG,

ACER and the EC held a number of trilateral meetings to

discuss the next steps.

\\

Once ACER

‘is satisfied’

that the NC is

‘in line’

with the

FG, ACER may choose to recommend the NC for adop-

tion by the EC.

 1) See Annex X ‘Versions of ENTSOG’s TAR NC and additional material’ and ENTSOG’s

website for all documents related to public consultations:

http://entsog.eu/publications/tariffs#All

 2) The reasoned opinion of ACER was published on 26 March 2015:

http://www.acer.europa.eu/Official_documents/Acts_of_the_Agency/Opinions/Opin- ions/ACER%20Opinion%2002-2015.pdf

 3) The TAR NC re-drafted by ENTSOG was submitted to ACER on 31 July 2015:

http://entsog.eu/public/uploads/files/publications/Tariffs/2015/TAR0500_150731_TAR- NC%20for%20Re-Submission_ACER.pdf

 4) See Annex X ‘Versions of ENTSOG’s TAR NC and additional material’.

ACER did not secure a favourable opinion of the Board of

Regulators for the re-submitted TAR NC, so it did not

provide such a recommendation

 5)

.

\\

The Gas Regulation envisages other ways forward in the

absence of ACER’s recommendation.

At the 28 

th

Madrid Forum the EC announced its decision

to ‘take over’ the few remaining steps for the finalisation

of the TAR NC. The Forum noted

‘the Commission’s in-

tention – taking due account of the views of ACER,

ENTSOG and stakeholders – to launch the formal legisla-

tive procedure still in Q1 2016’ 

 6)

.

\\

The Comitology Procedure involves the Gas Committee

(Committee on the implementation of common rules on

the transport, distribution, supply and storage of natural

gas), the European Parliament and the Council. The EC

adopts the NC at the end of the Comitology Procedure 

 7)

.

For the TAR NC, the relevant comitology documents are

available in the Comitology Register, including the draft

legal texts of the TAR NC, the associated impact assess-

ment and the Gas Committee’s voting sheet and the

summary record 

 8)

. The final TAR NC is published in the

Official Journal of the EU 

 9)

.

 5) No official announcement on ACER’s website. See conclusions of the 28

th

Meeting of the

European Gas Regulatory Forum of 14–15 October 2015 (‘The Forum takes note that

ACER is not providing a Recommendation on the Network Code regarding harmonised

transmission tariff structures for gas […]’.):

https://ec.europa.eu/energy/sites/ener/ files/documents/28th%20MF%20Conclusions%20V8.pdf

 6) See conclusions of the 28

th

Meeting of the European Gas Regulatory Forum of 14–15

October 2015:

https://ec.europa.eu/energy/sites/ener/files/documents/28th%20MF%20 Conclusions%20V8.pdf

 7) For the information on the TAR NC, see the beginning of this section and

‘TAR NC – a new gas network code’.

 8) See the dossier number ‘CMTD(2016)0778’ in the Comitology Register:

http://ec.europa.eu/transparency/regcomitology/index.cfm?do=search.result

 9) OJ L 72, 17.3.2017, p. 29.

ACER/EC

Evaluation

Gas Committee /

Council / Parliament

Comitology

Implementation by

TSOs, NRAs etc.

Entry Into

Force

Figure 1:

NC establishment process