TAR NC Implementation Document – Second Edition September 2017

Cost Allocation Assessments

ARTICLE 5 COST ALLOCATION ASSESSMENTS

Responsibility: subject to consultation per Article 26(1) by TSO/NRA, as NRA

decides; subject to decision by NRA, a deviation above 10% threshold needs to

be justified by the NRA in the decision

General

As part of the periodic consultation 

 1)

, NRAs will decide whether TSOs or NRAs

performup to two assessments to comply with the principle of avoiding cross-subsidies

between network uses. One assessment is for

capacity charges

, the other, if any, is

for

commodity charges

. These assessments help indicate the cost-reflectivity of

proposed tariffs based on the cost drivers set out in Article 5(1). The assessments

involve calculations that may be based on forecasted revenues, bookings, flows and

cost drivers, potentially based on historical data.

 1) See

Chapter VII ‘Consultations requirements’, Section ‘Article 26(1)

– content of the document for periodic consultation

and comparison to

Chapter VIII ‘Publication requirements’.

Pipeline

Cross-system network use

Cross-system network use

Entry-exit system

Intra-system

network use

Intra-system

network use

Figure 11:

Basis for performing cost allocation assessments