Vivergo Fuels
Ethanol Road Loading Improvements - URS
P & I Design Ltd
DOCUMENT NO: VI095002_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 28.07.2016
Tel: + 44 (0) 1642 617444
PAGE 14 OF 14
Fax: + 44 (0) 1642 616447
www.pidesign.co.uk8
DOCUMENTATION
8.1
Standardisation
It has been noted that there are multiple ways of referring to the same equipment /
systems across various documents. The opportunity should be taken to standardise
terminology and acronyms across documentation where they refer to the same item.
To aid this process it is suggested the abbreviations and definitions section of this
document act as a reference point and be expanded as necessary.
9
TESTING
The existing system is to remain operational throughout the changeover, with a phased
changeover being implemented to permit continued operation. An overall testing plan
will be developed to define and control the overall testing programme.
The nature of the system with its component building blocks means that standalone
testing will be performed on various systems prior to joining together in an integrated
test. Interfaces between the various systems will require particular attention.
Vivergo propose to setup a virtual test network. Further details and diagrams will be
supplied in due course.