16 |

Ten-Year Network Development Plan 2017 Annex C: Demand and Supply, C 1: Country Specifics

RO (ROMANIA)

Final gas demand

The TSO submitted the inputs for the different scenarios. No further comments have

been reported.

Power generation – general methodology

The TSO submitted the inputs for the general methodology. No further comments

have been reported.

RS (SERBIA)

Final gas demand

No Serbian data was submitted during the data collection. The total Serbian demand

for the TYNDP 2017 was calculated based on the available information about gas

exports to Serbia during the years 2014 and 2015 in the ENTSOG Transparency

Platform. For all scenarios the average yearly demand is the average export, the fig-

ures for the 2-week case are the maximum observed during 14 consecutive days

and the Peak is the daily maximum. The figures representing the total demand are

categorized as final demand.

Power generation – general methodology

See above.

SE (SWEDEN)

Final gas demand

The TSO submitted the inputs for the different scenarios. No further comments have

been reported.

Power generation – general methodology

The TSO has submitted its own data for the scenarios.

SI (SLOVENIA)

Production Data

At the moment in Slovenia there is no natural gas production facility in operation de-

livering gas to the transmission system. Based on the existing status of investments

and considering estimated capacities and possible economical aspects of operation

of natural gas production facilities, so far for the TSO, it is not possible to prepare a

reliable estimation of yearly produced quantities. The prediction of yearly quantities

will be possible based on the development of the first Slovenian project in the field

of natural gas production.